1 - 14 of 14 Items
Page 1 of 1
| Image | Title | Description | Date |
|---|---|---|---|
| Cache la Poudre Basin Study Extension. Executive summary | Executive summary of a study to refine the environmental, engineering, and economic analyses prepared during a basin-wide water resources investigation completed by the Colorado Water Resources and Power Development Authority and the Northern Colorado Water Conservancy District (Colo.) in January... |
1990-12 2005 |
|
| Cache la Poudre Basin Water and Hydropower Resources Management Study : final report. Volume 1Cache la Poudre Basin Study : final report. Volume 1 | Volume 1 of a two volume final report on the Cache la Poudre Basin Study. Volume 1 contains findings from the Phase 1 portion of the study, an appraisal of available water resources and future demands. |
1987-01 2005 |
|
| Cache la Poudre Basin Water and Hydropower Resources Management Study : final report. Volume 2Cache la Poudre Basin Study : final report. Volume 2 | Volume 2 of a two volume final report on the Cache la Poudre Basin Study. Volume 2 contains the findings from the Phase 2 portion of the study, addressing plan formulation, evaluation, and selection. |
1987-12 2005 |
|
| Clear Creek Project phase I, feasibility study : final report. Volume 1 | Summarizes a 13-month-long study of water and hydropower resource development in the Clear Creek Basin, making a preliminary evaluation of developing additional water supplies in the Clear Creek Basin. |
1987-11 2005 |
|
| Clear Creek Project phase I, step 2, feasibility study : final report. Volume 1 | Final report for the Clear Creek Project, phase I, step 2. Provides estimates of firm water supply yield and project cost for a range of possible water sources and dam sizes related to a main stem storage reservoir in Clear Creek Canyon, east of the Denver metropolitan area. Construction costs... |
1989-06 2005 |
|
| St. Vrain Basin Reconnaissance Study | Report of a comprehensive basin-wide study to identify the needs of the St. Vrain Basin for future water resources development and to identify and evaluate, at a reconnaisance level of detail, the means available to meet those needs through the development of new water supplies and through the... |
1986-02 2005 |
|
| Joint-Use Reservoir and Green Mountain Exchange Projects. Technical appendixesJoint-Use Reservoir and Green Mountain Exchange Projects. Appendixes | Appendix A. Hydrologic analysis -- <br>Appendix B. Preliminary dam design, reservoirs and conveyance system -- <br>Appendix C. Summary of the geotechnical investigations |
1987-04 2005 |
|
| Cherry Creek Water Resources Project phase I, feasibility study. Executive summaryCherry Creek Water Resources Project phase I, feasibility study : final report | Executive summary and final report of a preliminary evaluation of developing additional water supplies for the Cherry Creek Reservoir Watershed. A reconnaissance level of evaluation, the study characterizes the primary features and operations of alternative water development plans and provides a... |
1987-12 2005 |
|
| San Luis Valley Confined Aquifer Study (phase I). Executive summary : final report | Executive summary and final report for Phase 1 of the San Luis Valley Confined Aquifer Study on the feasibility of developing additional water supplies from the confined aquifer system of the San Luis Valley of south-central Colorado. |
1987-08 2005 |
|
| Joint-Use Reservoir and Green Mountain Exchange Projects : final report | Final report, including executive summary, of a study of projects based on two concepts advanced to resolve the problems associated with increasing water demands in the Denver metropolitan area and the concern over water supplies on the western slope of Colorado. Both concepts would require new... |
1987-04 2005 |
|
| San Luis Valley Confined Aquifer Study (phase I). Appendixes : final report | Appendix A : Task 1 report (water demands/economic analyses) -- <br>Appendix B : Task 2 report (data and information synthesis and needs) -- <br>Appendix C : Task 5 report (deep well testing and field investigations) |
1987-08 2005 |
|
| Fraser River Basin phase I, feasibility study : final report | This study involved the formulation and evaluation of alternative water management plans for the Fraser Valley in Colorado. This report documents the findings of the 21-month study. The study was initiated to identify and examine potential ground and surface water resource development projects in... |
1989-12 2005-08 |
|
| Upper Gunnison-Uncompahgre Basin phase I, feasibility study : final report | The objective of this study was to identify and evaluate water resource management plans to enhance the water-based economy of the Study Area in an environmentally sound manner. Both structural and non-structural components have been examined, evaluated and utilized to formulate alternative plans... |
1989-05 2005-08 |
|
| Upper Gunnison-Uncompahgre Basin phase I, feasibility study. Appendices : final report | Appendix A - Bibliography;<br>Appendix B - Existing water supply entities;<br>Appendix C - Ditches represented as aggregated depletions in the hydrologic/water rights model;<br>Appendix D - Key to hydrologic/water rights model network diagram;<br>Appendix E - Virgin inflow... |
1989-05 2005-09 |
1 - 14 of 14 Items
Page 1 of 1
